The M&NE detail drawing of this area show the cross-under at a slight angle then going into a curve to joint the Ann Arbor trackage. I'll look for the construction drawing on the bridge for date when the drawing was approved. Thanks for construction picture link gives one more reference. I'll clean up the M&NE drawing and add it to the web page.