Re: HESR Fertilizer or Grain in Flushing
I don't think you would see that line removed. The reason is NS. I think having the option to connect to NS and using a routing not involving CSX or CN still appeals to customers. That would be done with the line through Flushing. Would it still be operated by HESR? Maybe, maybe not. I could see HESR giving GLC trackage rights over the line. One other thing to consider is would HESR want to have a disconnected segment of railroad. Remember they do run from Durand to Owosso as well.
|