Re: Abandoned C&O line to Greenwood energy plant.
A couple of years ago, someone posted some pictures of what looked like the beginning of some brush removal along that stretch of the line. However, nothing ever moved over it after that. As Dan mentioned above, now the rails are paved over in Yale, and possibly other places as well. Why these rails remain in place is a mystery to me. Maybe it has something to do with the department of energy "rules", or something. Anyway, don't expect any kind of train over there any time soon. Rip Van Winkle will wake up before it happens!
|