Re: RE: San Yard
When the yard was build it was normally referred to as the 'new yard' by the railroad personal. The stock yard track once was a Wye into it. The Autolite group shipped batteries in 40' foot cars that were equipped with battery racks, which keep the outside braced cars in service longer, car were pooled from the Wabash, N,J&I and Annie to cover the service. Many went via the car ferry to AMC. The name 'SAN' does not show until GT make the track changes in my timetables.
|