Junction stopped quite some time ago. At one time.
there was a plan to ship ores from the Sudbury area to Chicago over this line. I assume that came to nought. How many shippers are located betweenthe Sault and Hearst? Is there much finished steel going north from the Sault on the former Algoma Central for interchange with the CN or the CP?
It would be very disappointing to see this line abandoned. It would make a nice bicycle trail in the summer and snow mobile trail in the winter.