Prior to the Escanaba shutdown of Emprie, CN was running two ore trains per day(U741/U743) and those are annulled. Ore trains will be called on as needed basic when Tilden pellets are routed through Ecanaba, plus when U.S. Steel moves some of its 15% of Tilden production. This leaves just the turn out of Escanaba as a regular move up to Ishpeming, handling freight and all-rai cars for Algoma.
Message Thread
« Back to index