I often wondered why they never wyed the south end of the bridge to eliminate backing trains besides cost. Now that might actually happen to streamline operations. Even a second wye at the mainline switch.
Time will tell. Shipping season on the river will resume in just a couple short weeks.
Message Thread
« Back to index