Also had to lumber loads to Williamsburg, and pulling 2 or 3 empties.
Also several tractors and about 8 guys plus flaggers working on the tracks in front of the depot- looks like they are digging up all the ground on each side of the rails like they did in Boardman yard. I assume they did that for drainage and to add ballast (or maybe no ballast this year??).
Also not sure how to get ahold of the proper GLC people- the crossing signals on South Airport on the track to Beacon, has at least one light head not working (for eastbound traffic). And #392 leading the train with no lights at all.
Message Thread
« Back to index