Why capacity in Plymouth Yard is now an issue requiring CSX to drop trains at Novi is what I wonder about. 
 
But like the LSRC interchange being run over the CN at Flint, I now believe CSX is dropping their interchange at Novi.
Message Thread 

« Back to index