The loading tracks appear to have been facing north, now they are south facing. Now there 8 loading tracks. Did production at this plant increase that significantly that they had to redo the loading tracks, or was it done in an effort to lessen switching moves (the previous alignment looks to only have offered about 3 racks to be loaded, as opposed to the 8 that can be loaded on each track.
Message Thread | This response ↓
« Back to index