CN has removed all the crossing signals on the White Pine sub at highways and added a simple crossbuck with except. They are either doing this for tax purposes or may be getting ready to pull the track up. But If CN Invests to bring this subdivision back online to serve the Copperwood mine (operation by 2021) would not be a need to go past Thomaston which is about the halfway point to White Pine.