
Posted by Dale on 7/20/2008, 6:51 pm
208.53.98.198
I was in the UP last week. Got a chance to see the Munising turn coming back at Trout Lake. Brought about 10-12 cars with it.
Then I went to Cedarville to see the limestone train, which came into the Port while I was in the parking lot. Baldwin engine 110 pushing 12 loads in front.
Does anyone know how many limestone trains run per day. Is there more than one train set?
Thanks, Dale
Message Thread:
![]()
« Back to thread